As per notification by DDA, the Delhi Development Authority has eased the norms for installing lifts in its apartment blocks (Roy,2011).
DDA flat owners in denotified areas can approach municipal corporation for No objection certificate or permissions. Our team provides complete solution for lift installation in DDA/CGHS/GH flats. We are an ISO 9001:2015, ISO 45001:2018, certified company & Govt approved company (recommended by Hon’ble Mayor of NDMC) for lift installation of lift in DDA apartments.
Further The Delhi high court also refused to interfere with the new lift policy that doesnot require the people to approach the agency.(The Hindu,2017). Ideally this is the best time to obtain lift NOC, because the SDMC has proposed a hike of upto two lakh rupees, which can be a very costly affair(TOI,2020).
MCD & DDA in suppression of earlier orders have issued simplified guidelines for obtaining N.O.C. FOR INSTALLATION OF LIFTS IN GH/CGHS/SFS/ other flats built by DDA.
as under:-
Consent guidelines:
The request for seeking NOC for installation of lift and connecting bridge should be submitted by Proposing Applicants* after obtaining necessary consent from owner(s)/ legal representative(s) of at least 50% of the flats in that staircase (of that block) who shall be beneficiaries upon the installation of lifts in DDA flats.
Furthermore, consent from ground floor flat owners is desirable but not mandatory for seeking NOC by applicants.
The proposal should be accompanied with Complete application with all necessary documents/Affidavits and other pre-requisites for issue of NOC.
Allottees in all the Colonies where services stand transferred to MCD as well as colonies where services are with DDA shall apply to SE(HQ), DDA of concerned Zone. The NOC shall be issued by CE(HQ) after due verification of documents. After the issue of NOC by DDA, the applicants must get modified drawings approved from local Municipal Authority, in the areas which have been de-notified before actual execution of work for successful installation of Lift in DDA flats.
While applying for NOC, the following documents/ indemnity bonds/affidavits are required to be submitted for approval:
i. Consent for installation of lift in individual block (served by a common stair case) from owner/legal representative of at least 50% of the flats in the stair case of that block.
ii. Recommendations of the lift manufacturing agency (preferably as per approved list of CPWD) to whom residents are likely to engage for installation of lift with regard to technical feasibility, location of lift well, safety aspects in respect of installation.
iii. Certificate from registered Structural Engineer/ Architect (on their letter head) stating that the structural design of lift well is as per provisions of National Building Code.
iv. Four sets of original building plan indicating location of the lift-well duly signed by registered Architect and proposing/secondary applicants.
v. Certificate regarding maintenance/operation aspect and safety requirement and bear all the cost for the above operation.
vi. Undertaking to obtain NOC from Chief Fire Officer, GNCTD (if applicable), Lift Inspector and Power/Electricity Distribution Company.
vii. NOC from the registered RWA of the particular block in case any shifting of services are involved for lift installation in DDA flats.
viii. Indemnity Bond from all the Proposing applicants* indemnifying to keep DDA harmless from any claim which anyone may, at any time, crop-up against the DDA.
ix. The group of proposing members who are beneficiaries of lift shall give an affidavit on stamp paper that there is no unauthorised
construction/construction beyond permissible limit including terrace floor of that particular block (the NOC for DDA lift installation shall not be processed till all such unauthorised constructions are removed/regularized). In any case lift shall not be allowed to go up to terrace level at all.
x. After examination of the proposal including all technical aspects by Superintending Engineer(Head Quarter) concerned, Director (Housing) & Senior Architect, and on their recommendations, CE(HQ) DDA will issue No Objection Certificate for installation of lift subject to deposition of requisite charges, if any, raised by DDA as discussed in para (xii) below for installation of lifts in DDA flats.
xi. Where absolutely necessary a provision of connecting bridge/walk way can be considered from the lift well to the landing point.
xii. A processing fee of Rs.5,000/-(non refundable) per lift will be charged by the DDA after verifying the check list (permission shall be granted within 45 days after submission of all complete acceptable documents). The payment can be made by DD in favor of concerned Sr.AO(CAU),DDA.
* Applicants are divided into two categories i.e. Proposing Member(s) and Secondary Member(s). Proposing Members are those who are currently using one common stair case only and contributing to the cost of installation of lifts and Secondary Members are those who are using common stair case but not contributing to the cost, however, consent for installation of lifts is given by them. Their total number should be at least 50% of all flats served by that staircase.
Note: Format of affidavit, undertaking and indemnity bond may be downloaded from DDA website “dda.org.in”.
The policy of lift installation in DDA flats, first notified on May 26, 2011, was subsequently modified on August 3, 2012, the urban body said. It has additionally been referenced in the arrangement that the lift well will be developed adjoining the visually impaired divider so regular light, ventilation and development isn't influenced and will be an autonomous structure.
To get the NOC for DDA lift installation, the lift should be installed in a manner that the stability of the existing structure is not affected and no weight is transferred on to the current structure.
We are a DDA/MCD approved, ISO 9001:2015, ISO 45001:2018 certified company, with a excellent track record with for providing complete solution for Structure lifts in DDA apartments.