Apartment Lifts | Modern & Safe Elevators for Residential Buildings

Apartment Lifts | Modern & Safe Elevators for Residential Buildings

Apartment & Society Lifts for 5–10 Floor Buildings

Wolf Lifts designs, installs and maintains gearless MRL apartment lifts that slash energy costs by 28 %, handle up to 80 trips per hour and meet every DDA/MCD requirement—turnkey.

Why Societies Choose Wolf Lifts

Our apartment lifts maximise car size inside existing wells, trim resident wait times with VVF group‑control logic, and use vandal‑resistant fixtures that thrive in high‑footfall residential environments. From paperwork to power consumption, we simplify every step of society lift installation.

Pain Points & Our Solutions

Challenge

Wolf Fix

Resident approvals & NOC maze

We draft consent forms, structural affidavits and file the DDA/MCD pack—zero society leg‑work.

High energy bills

Regenerative MRL drives feed braking energy back to the common panel, verified 28 % saving on live sites.

Maintenance downtime

IoT gateway + predictive parts stocking cut mean‑time‑to‑repair by > 40 %.

Technical Snapshot (2025 Spec)

Item

Value

Capacity

320 – 630 kg (4–8 persons)

Speed

1.0 m/s

Stops

Up to 10

Door Width

700 – 900 mm

Drive

Gearless MRL traction

Power

415 V 3‑phase

Trips/hr

≤ 80 with group control

Install Time

2 – 8 weeks

Compliance

BIS, IS 14665, EN 81‑20/50, MCD/DDA norms

Touchless call buttons, antimicrobial COP plates and fire‑rated doors are standard.

MCD / DDA Approval Roadmap

Step

Description

1

≥ 50 % Resident Consent – signed letters

2

Hire Architect & Structural Engineer – drawings + stability certificate

3

Compile Application Pack – forms, indemnity bond, fire NOC, lift‑maker’s feasibility

4

Pay Scrutiny Fee (≈ ₹25 000/shaft)

5

Submit via MCD Online Portal – track ID

6

Receive Sanction – written NOC (30‑45 days typical)

7

Form‑A to Electrical Inspector – erect lift

8

Installation & Testing – joint safety test

9

Form‑B Licence – annual renewals

Timeline: 4 – 8 weeks approvals + 4 – 6 weeks installation, subject to document completeness.

Case Study – Shivshakti, Dwarka

• Two 20‑year‑old lifts replaced

• Wait time ↓ 38 % | Energy use ↓ 28 % | 0 unscheduled outages in first year

• Resident satisfaction score 4.8 / 5

Frequently Asked Questions

Question

Answer

Do you manage all NOC paperwork?

Yes—consent, affidavits, structural report, MCD/DDA portal submission and site visits until final licence.

Can we keep using one lift while you replace the other?

Our phased plan swaps cars sequentially to maintain vertical mobility.

Solar compatibility?

Drives accept hybrid AC; daytime PV cuts grid draw without batteries.

Backup during outages?

Battery Auto‑Rescue delivers cabin to nearest floor in < 30 s.

Warranty & AMC?

24‑month full warranty; AMC from ₹ 22 /stop/month includes IoT monitoring.

Noise levels?

≤ 55 dB in lobby—quieter than a normal conversation.

Vandal protection?

IK‑10 stainless COP, polycarbonate lens, tamper alarm to guard console.

Annual licence renewal?

We schedule safety inspection, submit Form‑B and sticker—hassle‑free for RWA.

Need a question answered? Contact Wolf Lifts—response within one business day.

Get Your Free Society Lift Quote

Call +91‑7070707169 or click “Book Survey”—an engineer will assess your shaft and deliver a fixed‑price proposal within 48 hours.

Disclaimer

All figures, timelines and savings shown are illustrative. Final specifications depend on site conditions and regulatory updates. Always obtain a project‑specific design & quotation from Wolf Lifts Pvt Ltd before civil work or purchase.
 

FAQ

Book a Free Apartment Lifts

Book Now