What Is DDA Lift Installation Checklist?
The DDA Lift Installation Checklist is a mandatory set of technical, safety, and legal requirements issued by DDA and lift authorities for elevator installation in Delhi.
Wolf Lifts ensures 100% compliance with all DDA norms, fire safety rules, and lift inspection standards.
Pre-Installation Checklist by Wolf Lifts
Before lift installation, Wolf Lifts’ technical team verifies the following:
1. DDA-Approved Building Drawings
2. Site Readiness Inspection
3. Lift Type Selection by Wolf Lifts
We help you choose the right elevator:
Selection depends on building height, usage, load capacity, and power availability.
DDA Technical Checklist Followed by Wolf Lifts
Civil & Structural Requirements
Electrical Compliance
Mandatory Safety Features by Wolf Lifts
Fire & Safety Compliance (Wolf Lifts Standard)
Lift Installation Process by Wolf Lifts
During installation, Wolf Lifts ensures:
Post-Installation & DDA Inspection Checklist
Testing & Commissioning
Lift Inspection & Approval
Documentation Provided by Wolf Lifts
Why Choose Wolf Lifts for DDA-Approved Lift Installation?
Common Mistakes Wolf Lifts Helps You Avoid
Who Should Choose Wolf Lifts?
Yes, DDA approval is mandatory for lift installation in DDA-regulated areas in Delhi.
Approved building plan, structural drawings, electrical layout, installation certificate, and inspection reports.
Pit depth depends on lift type and capacity. It must follow manufacturer and DDA guidelines.
For commercial, hospital, and high-rise buildings, fire NOC is mandatory.
Generally, 15–30 days after successful inspection and document submission.
Yes, MRL lifts are allowed if they comply with DDA norms and structural requirements.